home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V10_4 / V10_406.ZIP / V10_406
Internet Message Format  |  1991-07-08  |  18KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/MZehVaa00VcJE3Wk5V>;
  5.           Wed, 10 Jan 90 01:38:31 -0500 (EST)
  6. Message-ID: <AZehVDK00VcJA3V04f@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Wed, 10 Jan 90 01:38:08 -0500 (EST)
  11. Subject: SPACE Digest V10 #406
  12.  
  13. SPACE Digest                                     Volume 10 : Issue 406
  14.  
  15. Today's Topics:
  16.            Payload Status for 01/09/90 (Forwarded)
  17.        Re: NASA Headline News for 01/09/90 (Forwarded)
  18.      Electromagnetic Braking (was Re: Nuclear Reactors in Space)
  19.        Re: March 1990 ANALOG article on self-refueling vehicles
  20.             Re: Photographer of the decade
  21.               Galileo Update - 02/09/90
  22.        Re: NASA Headline News for 01/09/90 (Forwarded)
  23.        Re: NASA Headline News for 01/09/90 (Forwarded)
  24.            Re: Soviet lunar module to be revealed?
  25. ----------------------------------------------------------------------
  26.  
  27. Date: 9 Jan 90 21:46:59 GMT
  28. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  29. Subject: Payload Status for 01/09/90 (Forwarded)
  30.  
  31. Daily Status/KSC Payload Management and Operations 01-09-90
  32.        
  33.          
  34. - STS-31R HST (at VPF) -
  35.       
  36. MUE validation was worked yesterday and will continue today.   
  37. HST lifting and fit check to the scuff plates was performed   
  38. yesterday.                                 
  39.         
  40. - STS-32R SYNCOM (at Pad A) -
  41.        
  42. Launch was delayed 24 hours to this morning with a launch    
  43. time of 0735 hours and it was a beautiful launch.
  44.        
  45. - STS-35 ASTRO-1/BBXRT (at O&C) -
  46.         
  47. Cite testing continued yesterday with troubleshooting being 
  48. performed most of the day.  BBXRT activation was completed 
  49. and interface checks were performed.  SPDB removal is planned    
  50. for today.  Tomorrow will power up for additional cite       
  51. testing and on Thursday plan to perform the cite closed loop      
  52. test for igloo.   
  53.  
  54. - STS-40 SLS-1 (at O&C) -
  55.         
  56. Weighing of racks 7 and 11 began yesterday and will continue 
  57. today.  Cable tie struts were worked on rack 4.  Module leak  
  58. check was performed.  Pyrell foam replacement continues.
  59.  
  60. - STS-42 IML (at O&C) -
  61.       
  62. No activity.
  63.  
  64. ------------------------------
  65.  
  66. Date: 9 Jan 90 23:48:05 GMT
  67. From: att!cbnewsh!brt@ucbvax.Berkeley.EDU  (benjamin.reytblat)
  68. Subject: Re: NASA Headline News for 01/09/90 (Forwarded)
  69.  
  70. In article <15081@bfmny0.UU.NET>, tneff@bfmny0.UU.NET (Tom Neff) writes:
  71. > In article <40131@ames.arc.nasa.gov> NASA sez:
  72. > >This is NASA Headline News for Tuesday, January 9.....
  73. > >
  74. > >The New York Times says the world's most powerful optical 
  75. > >telescope will become partially operational this spring.  ...
  76. > Here's what I don't get about this regular "NASA News" release.  Why in
  77. > hell do we need to pay NASA to tell us what the New York Times said that
  78. > morning?  
  79.  
  80. Because not all of us have the time to wade through NYT every morning
  81. just to find the one or two small stories per week that have anything to do
  82. with space. Thanks, Peter.
  83.  
  84. Ben Reytblat
  85. brt@homxc.att.com
  86.  
  87. ------------------------------
  88.  
  89. Date: 9 Jan 90 20:24:12 GMT
  90. From: terry@astro.as.utexas.edu  (Terry Hancock)
  91. Subject: Electromagnetic Braking (was Re: Nuclear Reactors in Space)
  92.  
  93. In article <1990Jan9.013636.4166@cs.rochester.edu> dietz@cs.rochester.edu (Paul Dietz) writes:
  94. >
  95. >In all this talk of nuclear vs. solar arrays for outer planetary
  96. >missions, another possibility hasn't been mentioned.  A spacecraft in
  97. >orbit around Jupiter is moving rapidly through a strong magnetic
  98. >field.  It should be possible to generate power with an electrodynamic
  99. >tether, especially when very near the planet.  
  100. >Now, this will slow the spacecraft, 
  101.                 ^^^^^^^^^^^^^^^^^^^
  102. >but the available kinetic energy is very large (Jupiter
  103. >has a very deep gravity well), and the orbit could be pumped up again
  104. >by slingshoting off Jupiter's moons.
  105.  
  106. >It would let
  107. >you, for example, place a spacecraft into low circular orbit
  108. >(not possible with ordinary chemical rockets without aerobraking),
  109. >and would give that LJO spacecraft a lot of power to play with
  110. >(maybe for radar observations of Jupiter's atmosphere?).
  111. >
  112. >    Paul F. Dietz
  113. >    dietz@cs.rochester.edu
  114.  
  115.     Suppose you were interested mainly in the braking effect, how
  116. efficiently could you get it to brake?  Also, how does the braking effect
  117. scale against the relative velocity between spacecraft and magnetic field?
  118. What about with the strength of the field?   How would a high-velocity 
  119. plasma effect it?  How would you design a system to brake against plasma?
  120.  
  121.     In particular, how would it work for a vehicle moving at perhaps
  122. 0.01 - 0.1 c into the interplanetary medium.  How about into the magnetic 
  123. fields associated with stars?
  124.  
  125.     My point is that if an efficient enough system could be designed,
  126. this would permit a Daedelus-Class starship to stop itself upon entering
  127. another star system -- a possibility not considered by the original proposers
  128. of the idea.
  129.  
  130.     Clearly the efficiency required is great, such a vehicle would need
  131. to be braked at several hundred gees in order to successfully enter stellar
  132. orbit in a sufficiently short distance to remain inside the interplanetary
  133. medium, and thousands if it must depend on the magnetic field.
  134.     However, if indeed the energy can be captured rather than dissapated,
  135. can't such a system increase its efficiency even further by creating a stronger
  136. field or some such?  (obviously, I'm a tad vague on the mechanism to use,
  137. this doesn't necessarily have to be an electrodynamic tether, of course).
  138.  
  139.     Just how far is this beyond current technology?
  140.  
  141. *******************************
  142. Terry Hancock
  143. terry@astro.as.utexas.edu
  144. *******************************
  145.  
  146. ------------------------------
  147.  
  148. Date: 9 Jan 90 16:53:48 GMT
  149. From: cs.utexas.edu!jarvis.csri.toronto.edu!utgpu!utzoo!henry@tut.cis.ohio-state.edu  (Henry Spencer)
  150. Subject: Re: March 1990 ANALOG article on self-refueling vehicles
  151.  
  152. In article <583@imokay.dec.com> borsom@imokay.dec.com (Doug Borsom) writes:
  153. >I thought that one of the objections to several of the SDI proposals
  154. >was that they would require orbiting nuclear reactors to power them
  155. >and such stuff was prohibited by the ABM treaty (which, of course, the
  156. >US never ratified, but which we pretty much observe)...
  157.  
  158. I think you've confused several treaties, actually.  The US did ratify the
  159. ABM treaty.  However, said treaty says nothing about reactors in space.
  160. There have been proposals for a ban on reactors in Earth orbit, but none
  161. has yet reached the stage of serious negotiations.  The Soviets have an
  162. operational series of reactor-powered radarsats (which, interestingly
  163. enough, they say they'd be willing to sacrifice for a no-reactors treaty).
  164.  
  165. The ABM treaty presents severe problems for SDI in much more direct ways:
  166. with slight exceptions, it flatly bans antimissile systems and development
  167. of same.
  168. -- 
  169. 1972: Saturn V #15 flight-ready|     Henry Spencer at U of Toronto Zoology
  170. 1990: birds nesting in engines | uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  171.  
  172. ------------------------------
  173.  
  174. Date: 9 Jan 90 22:14:50 GMT
  175. From: zaphod.mps.ohio-state.edu!samsung!munnari.oz.au!cluster!metro!otc!wayner@tut.cis.ohio-state.edu  (Wayne Robinson)
  176. Subject: Re: Photographer of the decade
  177.  
  178. in article <129794@sun.Eng.Sun.COM>, fiddler%concertina@Sun.COM (Steve Hix) says:
  179. > In article <1990Jan1.213436.16129@polyslo.CalPoly.EDU>, tdrinkar@cosmos.acs.calpoly.edu (Terrell Drinkard) writes:
  180. >> 
  181. >>  erc@khijol.UUCP (Edwin R. Carp) writes:
  182. >>  dakramer@phoenix.Princeton.EDU (David Anthony Kramer) writes:
  183. >> >>The editors of the magazine 'American Photo' nominated Voyager 2 as
  184. >> >>the photographer of the decade, although they leave the final award
  185. >> >Voyager, my eye!  Ansel Adams gets MY vote.
  186. >> 
  187. >> Not to be overly picky, but Adams' most famous pictures were taken
  188. >> during his 1916 trip to Yosemite, not during the 1980s;
  189.  
  190. So make him photographer of the century!!! ;-)
  191.  
  192.  
  193.  
  194.  
  195.  
  196. ---
  197. Do not fold, spindle            |    Wayne Robinson
  198. or mutate.                 |    Development Unit
  199.                     |    OTC Limited.
  200.                     |    wayner@otc.oz
  201.  
  202. ------------------------------
  203.  
  204. Date: 9 Jan 90 18:11:43 GMT
  205. From: cs.utexas.edu!usc!henry.jpl.nasa.gov!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@tut.cis.ohio-state.edu  (Ron Baalke)
  206. Subject: Galileo Update - 02/09/90
  207.  
  208.  
  209.  
  210.                           Galileo Mission Status
  211.                              January 9, 1990
  212.  
  213.      Galileo is now 14,308,100 miles from the Earth, 14,731,150 miles from
  214. Venus and is travelling at a Heliocentric velocity of 71,6390 miles per hour.
  215. Round trip light time is 2 minute, 32 seconds. The spacecraft's spin rate is
  216. 3.15 rpm and the attitude sun point angle is 2.05 degrees.
  217.  
  218.      Four SITURNS to the Sun were successfully performed without incident on
  219. December 26, 29 and January 2 and 5.
  220.  
  221.      A command was sent on December 22 to turn off the EPD detector bias
  222. voltage.  This action was taken to preclude damage or degradation to the
  223. sensitive detectors/electronics as a result of the AC bus voltage imbalance
  224. condition.   An indefinite removal of bias voltage will not cause
  225. damage/degradation to the detectors, however, a voltage bias-on condition is
  226. preferred.
  227.  
  228.      The science checkout portion of the EV-4 sequence was successfully
  229. performed from December 27 through December 30.  Prior to the instrument
  230. checkout activities, science covers were released/deployed for the DDS, EUV,
  231. UVS, and the PPR.  All spacecraft pyro event indications associated with cover
  232. actuators were as planned and without incident.  It is pointed out that the PLS
  233. and EPD covers were deployed/opened several weeks earlier; the SSI cover, which
  234. is transparent, is not planned for release until after Earth 2 flyby.
  235. Subsequent to the cover events, a fairly extensive science instrument checkout
  236. was performed.  In general, the scientists were pleased with the nature and the
  237. extent of the checkout activities and the operation of the instruments.
  238. Detailed data analysis is in process.
  239.  
  240.      The NIMS optics and radiator covers were released on January 3 as planned.
  241. Prior to cover deployment, the scan platform was moved from the 153 degree
  242. cone position to the 30 degree cone position and the spacecraft was
  243. transitioned from dual-spin to all-spin to ensure no possibility of cover
  244. deployment contact with any part of the spacecraft.  Shortly after cover
  245. deployment, the scan platform was repositioned to 153 degree cone location.
  246. Spacecraft pyro event indications were as expected with no anomalies observed.
  247. Subsequent to the pyro events, NIMS temperatures began dropping thus providing
  248. some additional evidence of cover deployment. However, the rate of temperature
  249. decrease was substantially slower than expected. Concern was raised that
  250. possibly the radiator cover did not fully deploy and may be "hung-up" and
  251. subsequently come free and perhaps hit some part of the spacecraft.
  252.  
  253.      An intensive analysis performed by the flight team and design personnel
  254. concluded that it is extremely unlikely that the NIMS cover if not deployed
  255. could hit the spacecraft or damage would occur if it did.  The flight
  256. team is now investigating possible actions to confirm cover deploy and if not
  257. deployed alternate actions to assure full deployment.  Navigation data is also
  258. being analyzed to help determine the state of NIMS cover deployment.
  259.  
  260.      Continued with telecommunication subsystem tests performed on January 4;
  261. all tests were completed without incident.
  262.  
  263.      A Delayed Action Command (DAC) was sent on January 4 to close the PPR
  264. cover prior to the scheduled sun acquisition on January 5.  The PPR cover was
  265. left open as a result of the thruster fire all clear alert code associated
  266. with an earlier performed HGA correction. The cover close command was needed
  267. to protect the PPR from possible thruster plume contamination associated
  268. with the sun acquisition.
  269.  
  270.      The DC and AC bus voltage imbalance measurements continued to fluctuate.
  271. All other power-related measurements continue to reflect as expected operation.
  272. A Tiger Team is investigating the AC/DC bus voltage imbalance. To date, no
  273. credible single design or component failure has been identified which could
  274. produce the observed anomalous measurements. Furthermore, the team concluded
  275. based on flight data and/or circuit analysis, that it is highly unlikely that
  276. the RTG, the CDS interface measurement electronics, the CDS, or the PPS
  277. imbalance sensor are the cause of the imbalance. Several other potential
  278. causes are still being investigated including coupling between the AC and
  279. DC power busses internal to the power subsystem and possible Spin Bearing
  280. Assembly (SBA) contamination.
  281.  
  282.      A total of 1114 realtime commands have been sent since to the spacecraft
  283. since launch; 192 were transmitted; of the 192, 51 were preplanned as a
  284. part of the sequence design; 141 were not.  Many of the unplanned commands
  285. were associated with the issuance of noninteractive instrument commands during
  286. the science checkout.  This two week period was the most active
  287. period of realtime commanding since launch.
  288.  
  289.  Ron Baalke                       |    baalke@mars.jpl.nasa.gov 
  290.  Jet Propulsion Lab  M/S 301-355  |    baalke@jems.jpl.nasa.gov 
  291.  4800 Oak Grove Dr.               |
  292.  Pasadena, CA 91109               |
  293.  
  294. ------------------------------
  295.  
  296. Date: 9 Jan 90 20:13:22 GMT
  297. From: bfmny0!tneff@uunet.uu.net  (Tom Neff)
  298. Subject: Re: NASA Headline News for 01/09/90 (Forwarded)
  299.  
  300. In article <40131@ames.arc.nasa.gov> NASA sez:
  301. >This is NASA Headline News for Tuesday, January 9.....
  302. >
  303. >The New York Times says the world's most powerful optical 
  304. >telescope will become partially operational this spring.  ...
  305.  
  306. Here's what I don't get about this regular "NASA News" release.  Why in
  307. hell do we need to pay NASA to tell us what the New York Times said that
  308. morning?  A lot of this reads like someone just sits at a desk each
  309. morning, zips through a dozen newspapers and magazines for interesting
  310. headlines, slaps NASA's name on top and hands it out.
  311.  
  312. Will someone please find this agency a mission!
  313.  
  314. [No disrespect to Peter Yee who just passes this on...]
  315. -- 
  316. "We plan absentee ownership.  I'll stick to       `o'   Tom Neff
  317.  building ships." -- George Steinbrenner, 1973    o"o   tneff@bfmny0.UU.NET
  318.  
  319. ------------------------------
  320.  
  321. Date: 9 Jan 90 20:55:36 GMT
  322. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  323. Subject: Re: NASA Headline News for 01/09/90 (Forwarded)
  324.  
  325. In article <15081@bfmny0.UU.NET> tneff@bfmny0.UU.NET (Tom Neff) writes:
  326. >>This is NASA Headline News for Tuesday, January 9.....
  327. >>
  328. >>The New York Times says the world's most powerful optical 
  329. >>telescope will become partially operational this spring.  ...
  330. >
  331. >Here's what I don't get about this regular "NASA News" release.  Why in
  332. >hell do we need to pay NASA to tell us what the New York Times said that
  333. >morning?  A lot of this reads like someone just sits at a desk each
  334. >morning, zips through a dozen newspapers and magazines for interesting
  335. >headlines, slaps NASA's name on top and hands it out.
  336.  
  337. NASA Headline News is an amalgam of internal and external space related
  338. news.  It is not really published for external use, but is really intended
  339. to supply a concise cull of current news to NASA readers.  You may have
  340. noticed which NASA organization (LPC) puts the news together.  I post the
  341. whole thing since some of the contents may be of interest to non-NASA readers.
  342. I'm under the impression that the NASA Headline News is used as an internal
  343. agency radio broadcast script -- what you see if the printed copy.
  344.  
  345.                             -Peter Yee
  346.                             yee@ames.arc.nasa.gov
  347.                             ames!yee
  348.  
  349. ------------------------------
  350.  
  351. Date: 9 Jan 90 15:19:11 GMT
  352. From: mcsun!ukc!icdoc!syma!nickw@uunet.uu.net  (Nick Watkins)
  353. Subject: Re: Soviet lunar module to be revealed?
  354.  
  355. In article <8912181657.AA27680@decwrl.dec.com> klaes@wrksys.dec.com (CUP/ASG,
  356. MLO5-2/G1 6A, 223-3283 18-Dec-1989 1201) writes:
  357. >        I was told by a friend who was watching CNN this weekend that the
  358. >    Soviets are going to display in the Moscow Space Museum an actual
  359. >    manned lunar module (or parts at least) from their manned lunar
  360. >    program of the 1960s and early 1970s.  He said the Soviets revealed
  361. >    their biggest problem in the program was getting a powerful enough
  362. >    booster, as the one they had exploded three times.  I presume they 
  363. They have revealed it was actually four.
  364. >    Does anyone have more information on this?  Thanks.
  365. Check out Aviation Week for January 8, 1990. Mission was 2 man. Lunar
  366. module (small compared to Apollo LM) would be launched by N-1, plus
  367. upper stage for TLI. Modified Soyuz (including orbital module) would then be
  368. launched by Proton, rendezvous with LM and stage, and be sent to moon.
  369. Rest of mission is as per Apollo except only one crewman descends.
  370.  AW&ST has one picture, of LM descent stage only, but says upper stage is
  371. a modified Soyuz orbital module also. Has anybody else seen any other pictures?
  372. Report is based on a visit by Caltech/MIT engineering professors to the
  373. Moscow Aviation institute where the hardware was.
  374.  I know this is redundant to those who see AW&ST but hope it is of
  375. interest to others. Closest mission profile to the real one that I
  376. recall seeing was in an article by Dave Woods years ago, but I think he
  377. had an A-2 involved somewhere as the Proton was never man rated. 
  378.  There are further details of the (never) manned Zond missions in the January
  379. edition of Spaceflight. The Cosmonauts interviewed say that there never
  380. was much chance of the landing mission actually occurring, hardware 
  381. notwithstanding. The lunar flyby seems to have been a different story.
  382.  
  383. Nick
  384. -- 
  385. Nick Watkins, Space & Plasma Physics Group, School of Mathematical
  386. & Physical Sciences, Univ. of Sussex, Brighton, E.Sussex, BN1 9QH, ENGLAND
  387. JANET: nickw@syma.sussex.ac.uk   BITNET: nickw%syma.sussex.ac.uk@uk.ac
  388.  
  389. ------------------------------
  390.  
  391. End of SPACE Digest V10 #406
  392. *******************
  393.